6. A project management professional can compare earned value performance data to all of the following project management tools EXCEPT: A. Critical path analysis. B. Technical performance metrics. C. Risk mitigation plans. D. Forecasted final costs and schedule estimates. 项目管理人员可以把挣值绩效数据和下述的项目管理工具进行比较,但不包括: A. 关键路径分析 B. 技术性能指标 C. 风险减轻计划 D. 最终成本预测和进度估算 我选C,给出的答案选D, 我觉得C是对的,各位高手呢?
49. What is the MOST effective process to ensure that cultural and ethical differences do not impede success of your multi-national project? A. Co-locating B. Traning C. Forming D. Teaming 要保证文化和道德差异不防碍一个跨国项目的成功,最有效的过程是: A. 协同定位 B. 培训 C. 团队形成 D. 团队建设 答案是B,为什么不选D呢
Here is Edward Bear, coming downstairs now, bump, bump, bump on the back of his head, behind Christopher Robin. It is, as far as he knows, the only way of coming downstairs, but sometimes he-feels that there really is another way, if only he could stop bumping for a moment and think of it. And then he feels that perhaps there isn't.